Pleasant Street Pump Stations
Project Location:
- Templeton, MA
Contractor:
- Ricciardi Bros.
Engineer:
- Kleinfelder
Scope:
- The project consisted of a factory fabricated Pump Station Control Building, on top of a two (2) story underground Dry Pit Pump Chamber, and associated 30’+ deep West Well. The entire system was factory fabricated completely, then separated for delivery, and installation at the project site. Our site installation team delivered and reassembled the structures onsite: including all mechanical, electrical, plumbing and HVAC interconnections and startup.
