Tanton Hill
Project Location:
- Ridgefield, CT
Contractor:
- Griffin Brothers Excavating
Engineer:
- Luchs Consulting Engineers
Scope:
- Installation of a fully prefabricated Pressure Reducing Valve Chamber: with ladder access, all associated interior piping, and custom support system. The vault also included a sump pump system, electrical lighting, and exhaust fan system.
